building a house can be a stimulating and exciting project, if you get it right
it could prove to be the most satisfying achievement of your life. Unfortunately
getting it right is where many people fail. Common sense says when you embark
on a course involving investment of substantial sums of money; a certain amount
of serious thought must go into it. It is surprising how many people leave their
common sense at home when they come to Spain. If in doubt take professional
advice! Below we have prepared a summary of the points that need to
be considered before embarking on a building project. If you have the time, the
courage, the patience and fully understand the meaning of the Mañana syndrome
then there is no reason why you cannot be a successful DIY builder. As stated
earlier, building yourself can be very rewarding but it can also be fraught with
problems. If, however, you want to relieve yourself of most of the strain
and have a relaxing, stress free build instead, then our Project Admin and Management
Dept. will organise and supervise everything for you without removing any of the
rewarding exhilaration from the project. In fact our aim is to be as flexible
as possible to allow you to be involved to a level which suits you best, be it
full time, part time, or not at all. There is a lot at stake so don't jump
in with both feet, its worth taking some time to consider all the angles. Think
about it long and hard. Doing it Yourself - Principle considerations All
building projects begin with a basic idea, your idea or someone else's idea it
doesn't matter. How it should look from outside, how many bedrooms, bathrooms,
how many floors, etc. etc. The ultimate aim of course is to produce a villa, a
finca, a chalet, or a house or whatever you prefer to call your property with
all the features you desire. The achievability of this aim depends on a number
of factors. The Budget The budget of course is very important;
you need to know exactly what your commitment is and what you can afford to spend.
You may need a mortgage, interest rates are currently low and the local Banks
are competing for business. Make sure you have sufficient funds available to complete
the job, and allow a bit more for unforeseen extras. Land prices vary considerably
as can be seen when browsing the land registry. It is important therefore you
choose an affordable plot. building costs on the other hand do not tend to
vary quite so much; the price quoted by a builder generally reflects the standard
of the finish. The following table may serve as a general guide: Basic
quality: 875.00 per m2 (No frills, inexpensive wall and floor tiles basic
sanitary ware.) Standard quality: 950.00 per m2 (Wall and floor
tiles to max cost of 15.00 m2, regular pine carpentry, basic kitchen.)
Superior quality: 1050.00 per m2 (Central heating, double glazed windows,
quality carpentry. Wall and ceramic floor tiles to 20.00 m2, good quality
sanitary ware.) Top quality: 1200.00 per m2 (As for Superior quality
but may include natural stone work, marble floors, employing special skills and
imported fittings.) The building Plot Insist the seller shows
you a copy of the escritura (deeds). This Notarised document will describe the
land and its boundaries. Be Aware, and this is most important: Simply because
the owner's name is on the escritura does not necessarily mean that he owns the
land. Every time a property is bought and sold a new escritura is created. It
is very important before entering into any agreement to purchase land, to ensure
it is free from liens, charges or other encumbrances. For a very small fee
you can obtain on-line details of any embargo's mortgages etc. listed against
the land in question. Other points worth investigating include:
- Existing rights of way, availability of services, e.g.
Water, electricity, telephone, sewerage, etc.
- Are
there any outstanding taxes to be paid?
- Is
the land suitable to construct the building you have in mind?
- Orientation,
North-facing property may prove to have a lack of sunshine. (Particularly important
in winter.)
- Is the land flat and suitable
for building?
- If the land inclines, e.g.
situated on the side of a hill what will be the cost of building additional reinforced
supporting walls?
- Are views likely to be
blocked by future building?
- Are you allowed
to remove trees on the plot?
The Town Hall
Visit
the Technical department, ask to see the general plan and enquire if the land
in question is categorised as building land, urban or rustic and is not classified
Restricted or Protected? Discuss the your plans and ideas with the technical
surveyor. Are you allowed the external features you want and will a project based
on your sketch or layout be accepted? The ability of those directly
involved Choose your architect carefully and ensure he works for you.
Often architects are retained by builders, either in house or independently. For
your own security it is very important that your architect has your interests
and your interests only in mind. The builder should follow the architect's plans
and directions to the letter. The architect is one of the key people to be
involved in your project. He should be available to discuss every detail of your
plan, several meetings may be necessary before the project is finalised and the
plans produced. Language can sometimes prove to be a problem; if your architect
can speak your language this is a great advantage. The Builder If
you can arrange a credit check on the builder it could save you many heartaches
in the future. Regrettably a minority of builders have created an unfortunate
reputation for the building trade in general, a few have been known to declare
bankruptcy half way through a job. Stage payments should be controlled
according to a schedule laid down in the building contract. Under no circumstances
should the builder be allowed to be ahead on payment. At various stages in the
building, his work will be inspected, if it is up to standard then payment for
work completed is authorised. It's worth establishing the total number of men
employed by the builder in his business. A one man and his dog operation could
take a very long time to finish the job! Ensure that the building contract
is drawn up by someone other than the builder and is as comprehensive as possible.
Builders have an irritating habit of adding extras, as the work progresses. Beware
an additional wall, a modified window, an extra archway or a new architectural
feature will be regarded as an extra and is likely to be expensive! Time
Scales Generally speaking from the time the site is cleared ready for
laying out the foundations an average sized house (250m2-350m2) should be completed
within eight to 10 months. Having said that there are other bureaucratic factors,
which could delay the project. building Licences and Planning permissions
can sometimes take an extraordinarily long time to complete. This can be due to
a number of factors depending whether you are building on Rustic land (outline
planning permission from the government department in Alicante can take six months
or more) or Urban land (anything from two to six months, depending on the Town
Hall.) Sometimes, if you are lucky your builder or architect will have
a colleague or friend in the appropriate department and sometimes this can help
speed things up! Enjoy your building project. Remember: If
you want a stress free build, then our Project Admin and Management Dept. will
organise and supervise everything for you. ^ Top
|